• Cogent DataHub
  • Industrial
    • Industrial AI
    • Industrial IoT
      • Edge Computing
      • DHTP – The DataHub Transfer Protocol
      • IIoT Protocol Comparison
      • Demo
    • Cogent DataHub
    • Security
    • DataHub™ Service
    • ETK – Embedded Toolkit
      • IoT Gateways
      • Tested Devices
  • Case Studies
    • Blog
    • White Papers
    • News
  • Partners
    • Microsoft
    • Siemens
    • AVEVA
    • Join Now!
  • Investors
    • Financials
  • About Us
    • Management
    • Customers
    • Careers
    • Legal Notices
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Citect battery manufacturing line

Case Study: Citect (Schneider Electric), USA

by Bob McIlvride
Citect optimizes OPC-based system using the DataHub

A major battery manufacturing plant in the United States was recently faced with an interesting data integration challenge. Management needed access to data coming from a large number of different processes. Over 220 OPC-enabled field devices across the plant had to be connected to a single Citect MES system. The many OPC servers used for these connections are unique in that their data set is very dynamic. From one minute to the next any of the 220 devices may be present or absent in the data set.

citect-logo “Our challenge was to provide data from our dynamically changing OPC servers to a Citect system that is designed to work with a fixed data set,” said the company project leader. They decided to bring in a team from Citect to come up with a solution.

Citect, of Schneider Electric, is well known in the industrial process control world for their line of automation and control software solutions, particularly their MES systems. Dan Reynolds, the team leader for Citect, had heard about the DataHub® through his support department, and thought it might work. They configured the DataHub for OPC tunneling, to communicate across the network without the hassles of DCOM. And, thanks to the DataHub’s unique approach to OPC tunnelling, Dan found that it also solved the problem of providing a fixed data set.

Battery Production Facility diagram

“The DataHub mirrors data across the tunnel,” said Dan, “so the Citect system sees a constant data set. When a device goes offline, the tag remains in the DataHub. Just the quality changes from ‘Good’ to ‘Not Connected’.” Confident in their approach, the Citect team moved the testing from their location to the battery plant. But they soon found themselves faced with another challenge.

The production system is designed so that a field device can add or remove OPC items at any time. So, not only the OPC servers, but individual tags can suddenly appear or disappear from the system. When a new tag comes online, the server updates its tag count, but doesn’t say that a new value is available, because the OPC specification doesn’t require a server to say when a new point is created. This looked like a show-stopper for the configuration team. They knew that there is no OPC product on the market that can deal with that kind of behavior. Continually rereading the data set was not possible, because new points may be added during the read. So Dan got in touch with Cogent (a subsidiary of Skkynet), and working together they came up with a plan.

The solution was two-fold. First, the device behavior was modified to compact the tag add/delete cycle to a limited time. Then Cogent wrote a DataHub script that monitors a few OPC server tags, and when these tags change, a time-delayed function in the script re-reads the server’s data set. The scripted time delay allows for all the new points to be added before the data set is reread, and the DataHub thus discovers all of the new data as soon as it all becomes available.

“We are pleased with the performance of the DataHub for this application,” said Dan Reynolds. “There is no way we could have done this project with any other OPC tunneling product, or combination of products.”

“The Skkynet software has become an integral part of our MES solution,” said the project leader. “Without the DataHub, we would not be getting reliable data. If we hadn’t had it, our MES integration project would probably have come to a halt.”

Share this entry
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on LinkedIn
  • Share by Mail
https://skkynet.com/media/case-study-citect-usa.webp 720 1281 Bob McIlvride https://skkynet.com/media/skkynet-logo.svg Bob McIlvride2016-04-11 12:00:312024-11-15 12:08:21Case Study: Citect (Schneider Electric), USA
SKKYNET CASE STUDIES

See which solutions to real-world automation problems we deliver for use-cases most relevant to you.

Recent Entries

  • Wood processing plant case study - banner
    Case Study: Wood Processing Plant in North America
  • case-study-heritage-petroleum
    Case Study: Heritage Petroleum, Trinidad and Tobago
  • wind-turbine-control-usa
    Case Study: Wind Turbine Control, USA
About Us Icon white

About Us

Skkynet has been helping organizations securely share real-time data for more than 25 years. We offer privately-hosted or fully managed solutions for moving data in industrial, embedded and financial systems, from anywhere to anywhere.

News

June 18, 2026

Skkynet Reports Q2 FY2026 Financial Results

January 28, 2026

Skkynet Reports Fiscal 2025 Financial Results: Subscription Revenue Surges 268% Amidst Strategic Pivot to AI and SaaS

December 18, 2025

Skkynet Announces C$2.6 Million Industrial AI Product Development Initiative

December 16, 2025

Skkynet Appoints M&A and Software Executive Shaunna Balady to Advisory Board

Contact us icon white

Contact Us

Skkynet
2233 Argentia Road, Suite 302
Mississauga, ON L5N 2X7

International: 1-905-702-7851

US/CA Toll Free: 1-888-702-7851

[email protected]

Skkynet logo white

Cogent DataHub | Industrial | Case Studies | Partners | Investors | About us

Back to Top

linkedIn logotwitter logoyoutube logo

© 2026 Skkynet | All rights reserved | Legal notices
Link to: Case Study: PowerData, Caribbean Link to: Case Study: PowerData, Caribbean Case Study: PowerData, CaribbeanSt. Maarten, Caribbean Link to: Case Study: ABB, Colombia Link to: Case Study: ABB, Colombia ABB logo on buildingCase Study: ABB, Colombia
Scroll to top Scroll to top Scroll to top

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in .

Skkynet logo
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Cookie Policy

More information about our Cookie Policy